Honest fence (read first): Tulare facts come from Tesla Charging (Oct 9), Pilot’s Oct 8 newsroom release (Flying J #1071, opening Oct 9), and TeslaNorth (Oct 11). The ~$0.60/mi vs >$1.00/mi diesel comparison is Dan Priestley’s claim for California on “our Megacharger network” — not an audited fleet cost, and not a published Tulare tariff. Tesla has not published Tulare’s kWh price, measured stall power, or whether outside fleets can charge there. The 1.2 MW / 60% in 30 minutes figures are the Pilot/Tesla network spec, not a Tulare measurement. Embed: Out of Spec BITS Z_LoSPhKcq4 (oEmbed 200) — footage is the Ellabell, GA Pilot opening, not Tulare. Use it only as hardware context for what a Pilot/Tesla Megacharger site looks like. Soft re-cover: the Oct 8 Georgia East Coast post gets one line of context only.
Out of Spec BITS — “I Went To The First Tesla Megacharger Unveil Event! Full Tour”. Facts on this page cite the primary sources below, not the video.
Editorial Thesis
An electric Semi is only as useful as the places it can charge — and as honest as the cost story attached to those places. This week Tesla put a West Coast Megacharger on the map in California’s Central Valley freight belt. The same day, Tesla’s Semi program lead put a cost-per-mile number next to it.
That is the Robotaxi Thursday Semi story: a named site plus a company cost claim, still missing the one number fleet operators usually need first — price per kWh at the stall.
Honest Verdict
Believe the Tulare opening as company- and partner-stated: 4 stalls, Flying J #1071, Hwy 99 corridor, dated Oct 9 in Pilot’s release and posted by Tesla Charging the same evening. Treat “5th public site” and 30+ by end-2026 as Tesla targets relayed in secondary posts. Treat ~$0.60/mi as Priestley’s California Megacharger-network claim, not a Tulare receipt. Treat 1.2 MW as network marketing spec until someone publishes a measured Tulare session. Do not pretend the Out of Spec tour is filmed in Tulare.
What the primaries actually say
Tesla Charging (Oct 9, 8:27 PM ET)
- “New Tesla Megacharger: Tulare, CA (4 stalls),” linking
tesla.com/findus?location=456953, with an overhead site photo.
Pilot newsroom (Oct 8)
- Named Flying J #1071, Tulare, CA, opening October 9, 2026 among sites near completion (alongside Fort Stockton TX and North Las Vegas NV — those two without dates in the release).
- Sites planned for 4–8 stalls.
- Quotes Tesla: stalls deliver up to 1.2 megawatts; ~60% of charge in 30 minutes “according to Tesla.”
Dan Priestley (Oct 9, 8:56 PM ET)
- Quote-posting Tulare: “Energy costs in California: >$1.00/mi diesel / ~$0.60/mi on our Megacharger network with Tesla Semi.”
- Basis (load factor, route, rate schedule, demand charges) is not stated.
TeslaNorth (Oct 11) — secondary labeled
- Places the site on Hwy 99 between Fresno and Bakersfield in the Central Valley produce/dairy freight belt.
- Notes Tesla didn’t share the site’s charging speed, whether it is open to outside fleets or only Tesla’s own trucks, or which carriers will use it.
- Address context cited in related coverage: 979 E. Paige Ave (Drive Tesla Canada).
Network context (one line)
- Live AISN Oct 8 post already covered Conley + Ellabell, Georgia (East Coast). Today’s lede is Tulare + Priestley’s cost-per-mile claim, not a Georgia redo.
Claim vs proof
| Claim | Support | Level |
|---|---|---|
| Tulare 4-stall Megacharger open / posted | Tesla Charging + Pilot | Strong |
| Flying J #1071 / Oct 9 opening | Pilot newsroom | Strong |
| 5th public U.S. site | Merritt relaying Tesla | Secondary |
| ~$0.60/mi Megacharger vs >$1 diesel CA | Priestley X | Company claim (unaudited) |
| Published Tulare $/kWh | — | Missing |
| 1.2 MW measured at Tulare | Pilot quotes Tesla network spec | Spec, not site measurement |
| Out of Spec video = Tulare | Transcript / event | False — Ellabell GA |
Video note
Z_LoSPhKcq4 is a full hardware tour of the first Pilot/Tesla Megacharger unveil — transformers, cabinets, MCS dispensers — filmed at Ellabell, GA. Use it so readers see the hardware class. All Tulare facts stay with Tesla Charging, Pilot, and TeslaNorth.
Bottom Line
Believe the Tulare opening as company- and partner-stated: 4 stalls, Flying J #1071, Hwy 99 corridor, dated Oct 9 in Pilot’s release and posted by Tesla Charging the same evening. Treat “5th public site” and 30+ by end-2026 as Tesla targets relayed in secondary posts. Treat ~$0.60/mi as Priestley’s California Megacharger-network claim, not a Tulare receipt. Treat 1.2 MW as network marketing spec until someone publishes a measured Tulare session. Do not pretend the Out of Spec tour is filmed in Tulare.Sources
- Tesla Charging on X — 'New Tesla Megacharger: Tulare, CA (4 stalls)' + findus link (Oct 9, 2026, 8:27 PM ET)
- Dan Priestley (@danWpriestley) on X — '>$1.00/mi diesel / ~$0.60/mi on our Megacharger network' quoting Tulare (Oct 9, 2026, 8:56 PM ET)
- Pilot newsroom — Pilot and Tesla Open First Megacharger Site…; Flying J #1071 Tulare CA opening Oct 9, 2026 (Oct 8, 2026)
- TeslaNorth — Tesla Semi Megacharger Tulare CA (Sarah Lee-Jones, Oct 11, 2026)
- Sawyer Merritt on X — fifth U.S. Semi Megacharger; 30+ stations / 200+ posts by end-2026 (Oct 9, 2026; secondary, relaying Tesla)
- AI Shift News — live post ‘Tesla Megacharger Network Reaches the East Coast in Georgia’ (Oct 8; one-line context only)
- Out of Spec BITS — First Tesla Megacharger Unveil Event Full Tour (oEmbed 200; footage is Ellabell GA, not Tulare — hardware context only)